![](https://static.wixstatic.com/media/d10897_91aa91184e9648d888cc8cdd3cee4924~mv2.jpg/v1/fill/w_288,h_288,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/d10897_91aa91184e9648d888cc8cdd3cee4924~mv2.jpg)
PROJECTS & CASE STUDIES
![](https://static.wixstatic.com/media/d10897_55b2cb8c9b0d4e838ed99f7dde946bfb~mv2.jpg/v1/fill/w_496,h_496,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/d10897_55b2cb8c9b0d4e838ed99f7dde946bfb~mv2.jpg)
BLUETOOTH DATA COLLECTION & PERFORMANCE MANAGEMENT SYSTEM
Installation of semi-permanent Bluetooth Arterial Travel Time System (BATTS), collecting accurate traffic data for planning and project monitoring.
![](https://static.wixstatic.com/media/d10897_ac2b7a61e34246048685cdc47fb386a2~mv2.jpg/v1/fill/w_496,h_496,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/d10897_ac2b7a61e34246048685cdc47fb386a2~mv2.jpg)
KYEAMBA GAP WEST HEAVY VEHICLE WARNING SYSTEM
The Kyeamba Gap West Rest Area marks the approximate halfway point between Sydney and Melbourne on the Hume Hwy (M31). A popular rest area shared by heavy and light vehicles.
![](https://static.wixstatic.com/media/d10897_a7ae9b77be37475cb12e1bb1581a21de~mv2.jpg/v1/fill/w_496,h_496,al_c,lg_1,q_80,enc_auto/d10897_a7ae9b77be37475cb12e1bb1581a21de~mv2.jpg)
M5 LEGACY WAY PROJECT
The M5 Legacy Way enables a four-minute commute between the Western Freeway and the Inner City Bypass in Brisbane. Two separate, parallel tunnels are both two lanes, 4.6 kms in length.
![](https://static.wixstatic.com/media/d10897_7103d717fbcd4fb594a3f47a84f7f2b0~mv2.jpg/v1/fill/w_496,h_496,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/d10897_7103d717fbcd4fb594a3f47a84f7f2b0~mv2.jpg)
MOBILE TRAVEL TIME DISPLAY
Equipped with Bluetooth Sniffers, the variable message signs were configured to display travel time in real-time.
![](https://static.wixstatic.com/media/d10897_50ca162666324e0084fbfd6f5c02ac9f~mv2.jpg/v1/fill/w_496,h_496,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/d10897_50ca162666324e0084fbfd6f5c02ac9f~mv2.jpg)
SCHOOL ZONE SIGNS WESTERN AUSTRALIA
WA Main Roads reports the project's benefits on its website, citing raised motorist awareness, a speed reduction and increased driver conformance.
![](https://static.wixstatic.com/media/d10897_91aa91184e9648d888cc8cdd3cee4924~mv2.jpg/v1/fill/w_496,h_496,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/d10897_91aa91184e9648d888cc8cdd3cee4924~mv2.jpg)
SEMI-PERMANENT ROADWORKS VSLS
Solar-Powered, 3G-enabled Variable Speed Limit Signs (VSLS) installed onto existing infrastructure to respond rapidly to traffic conditions and roadworks speed requirements during the M1/M3/Gateway Merge Project.
![](https://static.wixstatic.com/media/d10897_c847656b5830401297de7fbde50728d4~mv2.jpg/v1/fill/w_496,h_496,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/d10897_c847656b5830401297de7fbde50728d4~mv2.jpg)
SOLAR WAY FINDING TOTEMS
Stand-alone parking signage that solves power and data problems using solar and 3G connectivity. These signs are available through our partner, Park Assist.