PROJECTS & CASE STUDIES
BLUETOOTH DATA COLLECTION & PERFORMANCE MANAGEMENT SYSTEM
Installation of semi-permanent Bluetooth Arterial Travel Time System (BATTS), collecting accurate traffic data for planning and project monitoring.
KYEAMBA GAP WEST HEAVY VEHICLE WARNING SYSTEM
The Kyeamba Gap West Rest Area marks the approximate halfway point between Sydney and Melbourne on the Hume Hwy (M31). A popular rest area shared by heavy and light vehicles.
M5 LEGACY WAY PROJECT
The M5 Legacy Way enables a four-minute commute between the Western Freeway and the Inner City Bypass in Brisbane. Two separate, parallel tunnels are both two lanes, 4.6 kms in length.
MOBILE TRAVEL TIME DISPLAY
Equipped with Bluetooth Sniffers, the variable message signs were configured to display travel time in real-time.
SCHOOL ZONE SIGNS WESTERN AUSTRALIA
WA Main Roads reports the project's benefits on its website, citing raised motorist awareness, a speed reduction and increased driver conformance.
SEMI-PERMANENT ROADWORKS VSLS
Solar-Powered, 3G-enabled Variable Speed Limit Signs (VSLS) installed onto existing infrastructure to respond rapidly to traffic conditions and roadworks speed requirements during the M1/M3/Gateway Merge Project.
SOLAR WAY FINDING TOTEMS
Stand-alone parking signage that solves power and data problems using solar and 3G connectivity. These signs are available through our partner, Park Assist.